Velleman DVM850BL Instructions d'exploitation Page 8

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 8
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 7
DVM850BL GB
8
6.7. AUDIBLE CONTINUITY TEST
1. Connect the red test lead to "VmA" and the black one to "COM".
2. Set the range switch in the " " position.
3. Connect the test leads to two points of the circuit to be tested. If continuity exists, the built-
in buzzer will sound.
7. BATTERY & FUSE REPLACEMENT
When" " is displayed, the battery should be replaced.
Fuses rarely need replacement and blown fuses almost always result from human error.
To replace the battery or fuse (200mA / 250V), simply remove the 2 screws at the back of the
case. Remove the old specimen and insert the new one.
Please remember to observe battery polarity.
8. WARNING
Before attempting to open the case, verify if the test leads have been disconnected. Before
using the meter, please remember to close the case and tighten the screws properly in order to
avoid electroshocks.
9. ACCESSORIES
User manual
Set of test leads
Gift box
9V battery
Holster
Vue de la page 7
1 2 3 4 5 6 7 8

Commentaires sur ces manuels

Pas de commentaire